Source start fish web site
Position de tucano sur la carte
https://i.servimg.com/u/f62/13/32/73/06/tucano10.jpg
https://i.servimg.com/u/f62/13/32/73/06/tucano11.jpg
TUC-T-162
Location: 130 km from Salvador
Area: 182 Km²
Commitment: 3500 UT
Partnership Participation:
30% - Starfish
20% - Hocol S.A.
50% - Petrobras
TUC-T-167
Location: 130 km from Salvador
Area: 188 Km²
Commitment: 2650 UT
Partnership Participation:
30% - Starfish
20% - Hocol S.A.
50% - Petrobras
carte détaillée
http://www.starfish-oilgas.com.br/midia_mapas/mapas_reconcavo_tucano_eng.pdf
Info sans date:
In 2006, Starfish participated in the 8th Bid Round promoted by of the Brazilian National Petroleum Agency (ANP), and awarded TUC-T-162 and TUC-T-167 blocks, in the Tucano Basin, with the commitment of a minimum work program of 3500 and 2650 WU (working units) respectively. Both blocks are located at 130 km from Salvador.
However, the 8th Bid Round is temporarily suspended by an issued judge injunction due to a rule that restricts the number of Bids per operator, as described in the items 4.5 and 4.8 of the Final Tender Protocol. Therefore the Concession Agreements related to the blocks awarded in the 8th Bidth Round were not signed yet.
The ANP have informed that is working on this case to restore and give continuity to the process.
Position de tucano sur la carte
https://i.servimg.com/u/f62/13/32/73/06/tucano10.jpg
https://i.servimg.com/u/f62/13/32/73/06/tucano11.jpg
TUC-T-162
Location: 130 km from Salvador
Area: 182 Km²
Commitment: 3500 UT
Partnership Participation:
30% - Starfish
20% - Hocol S.A.
50% - Petrobras
TUC-T-167
Location: 130 km from Salvador
Area: 188 Km²
Commitment: 2650 UT
Partnership Participation:
30% - Starfish
20% - Hocol S.A.
50% - Petrobras
carte détaillée
http://www.starfish-oilgas.com.br/midia_mapas/mapas_reconcavo_tucano_eng.pdf
Info sans date:
In 2006, Starfish participated in the 8th Bid Round promoted by of the Brazilian National Petroleum Agency (ANP), and awarded TUC-T-162 and TUC-T-167 blocks, in the Tucano Basin, with the commitment of a minimum work program of 3500 and 2650 WU (working units) respectively. Both blocks are located at 130 km from Salvador.
However, the 8th Bid Round is temporarily suspended by an issued judge injunction due to a rule that restricts the number of Bids per operator, as described in the items 4.5 and 4.8 of the Final Tender Protocol. Therefore the Concession Agreements related to the blocks awarded in the 8th Bidth Round were not signed yet.
The ANP have informed that is working on this case to restore and give continuity to the process.